Production Process

From Raw Material to Shipping Container

Six controlled stages, one factory. Every step is monitored and documented so your order arrives with consistent quality — from the first batch to the full container.

  1. 1 IN

    Material Inspection

    Every incoming batch of brass, ceramic and raw materials is inspected for composition, dimensions and surface quality before production.

    Incoming QC
  2. 2 CNC

    CNC Machining

    Precision CNC machining produces consistent dimensions and smooth surfaces for bodies, valves and connection parts.

    Precision
  3. 3 FIN

    Surface Finishing

    Multi-step polishing and electroplating create durable, scratch-resistant finishes including chrome, nickel and brushed black.

    Finishing
  4. 4 ASSY

    Assembly

    Cartridges, hoses and accessories are assembled in clean workstations with strict torque and sealing control.

    Assembly
  5. 5 QC

    Quality Control

    100% inspection including water flow, pressure resistance and appearance checks; samples are sent to the lab for durability testing.

    100% Check
  6. 6 PKG

    Packing

    Products are protected with professional packaging and export cartons, then container-loaded with packing lists for shipment.

    Export Ready

Quality Control

Every Unit Tested. Every Shipment Documented.

Request via WhatsApp
100%

Water Test

Every faucet and valve is pressure and leakage tested before packing.

48h+

Salt Spray Test

Finish durability verified in accelerated corrosion testing chambers.

500K

Cycle Endurance

Cartridges and moving parts validated for long-term commercial use.

Automated CNC machining line
Water testing quality control

Factory Visits & Samples

See Our Lines in Action

Visit our plant for an on-site audit, request pre-production samples, or receive a video walkthrough of your product running down the line. Our export team will arrange everything.

Sample lead time typically 7–15 days · Factory audits welcome year-round

Cleanote export warehouse
WhatsApp